  • Steel jacketed underground steam insulation pipe

Steel jacketed underground steam insulation pipe

The construction quality of directly buried steam pipelines is crucial and must be strictly controlled at every production process. Quality must be rigorously inspected and implemented according to design requirements, especially for joint insulation construction, which must be strictly controlled and checked one by one to ensure construction quality.

Phone/WeChat:

Keywords:

Insulated pipeline

Share to

  • Product Description
  • Product Introduction

    The construction quality of direct-buried steam pipelines is crucial. Every production process must be strictly controlled, quality must be thoroughly inspected, and implementation must follow design requirements. Especially for joint insulation construction, strict control and individual inspection are necessary to ensure construction quality.
    2. Necessary measures must be taken during the rainy season to prevent flooding and pipe flotation. Once insulation materials get wet, it will be difficult to completely remove the water, which greatly reduces insulation effectiveness, increases heat loss, and may cause damage or rupture to the insulated pipes.
    3. To ensure construction quality, welds should be initially welded with argon arc welding and the main pipeline should undergo flaw detection.
    4. Before pipeline trial operation, the trench must be backfilled to ensure sufficient friction between the insulation layer's outer shell and the soil, preventing the insulation layer from being damaged due to expansion and contraction along with the inner steel pipe.
    5. Strict initial operation procedures must be followed. During operation, ensure the pipe warming time because steam temperature is high. The pipeline must be heated slowly to allow the pipe and insulation layer to separate smoothly and avoid insulation damage. Since the insulation layer is moist, slow heating allows moisture to be evenly expelled through the vent pipe, preventing insulation layer bursting. When the vent pipe releases almost no gas, the steam supply can be increased gradually until reaching the operating load. The figure shows our company's pipe warming and temperature maintenance curve.
    Additionally, before steam introduction, condensate in the steam pipeline network must be fully drained. During operation, fluctuations in thermal load magnitude and frequency should be minimized.
    Regularly check the drainage devices to ensure condensate flows smoothly and avoid water hammer. Water hammer not only damages compensators but also causes insulation structure damage due to strong vibrations. This occurs because when thermal load changes significantly in magnitude and frequency, thermal displacement varies frequently. Using composite insulation pipes increases friction between the working pipe and inner insulation material. According to relevant data, over a 16-year thermal network lifespan, friction between the working pipe and inner insulation layer can reach 15,000 to 20,000 times. Generally, rigid insulation materials cannot withstand such repeated wear, especially due to the pipe's own weight causing more severe friction at the bottom. Improper handling will damage the insulation structure's performance and reduce the insulation pipe's lifespan. (8) All pipeline components and supports must be purchased from units approved by the national special equipment safety supervision department and must have product quality certificates, installation and maintenance instructions, and supervision and inspection documents. Their quality must not be lower than the current national standards.
    (9) Pipeline installation should only proceed after the following conditions are met: civil engineering inspection is qualified and installation requirements are satisfied; pipeline components and supports have passed inspection; pipes, fittings, valves, and other internal parts are cleaned.

One-stop Manufacturer for Production, R&D, and Supply

Worry-free After-sales

Sufficient Stock

Complete Specifications

Worry-free After-sales

Dozens of production lines, capable of handling large and urgent orders

Shipping
Pipeline
Factory building
Exhibition Area
Factory Area
Work Environment

Widely used in various industries

Tap water engineering

Tap water engineering

Petrochemical industry

Petrochemical industry

Fire protection engineering

Fire protection engineering

Heating engineering

Heating engineering

Agricultural irrigation

Agricultural irrigation

Urban construction

Urban construction

Widely used in various industries

How are the products packaged and shipped?


In terms of packaging, steel pipes are usually bundled with steel strips and wrapped with moisture-proof plastic film; pipe fittings are packed in wooden or cardboard boxes, with foam and other cushioning materials inside to ensure they are not damaged during transportation. For transportation, we cooperate with multiple professional logistics companies and can choose sea, air, or land transport according to your requirements. The specific mode of transport depends on the weight, volume, destination of the goods, and your time requirements.

How is the product price determined, and is there room for a price reduction?


The product price is determined by factors such as the comprehensive cost of raw materials, the complexity of the production process, and market supply and demand. The quotation we provide is very reasonable. While ensuring product quality, if your order quantity is large, we can offer a certain quantity discount; or long-term cooperative customers can also enjoy special discounts.

We want to customize products. Can you manufacture according to the specifications we provide? How long does the customization process take?


We have strong custom manufacturing capabilities and can produce according to the specifications you provide. The time required for the customization process depends on the product specifications and quantity, generally taking 4-6 weeks. You can provide us with detailed specifications, and we will offer you a more accurate schedule.

What international certifications do your products have? Do they comply with our country's safety standards?


Our products have passed international standard certifications such as ISO 9001 Quality Management System certification and CE certification. Please inform us of your country's specific safety standard requirements so that we can confirm whether our products comply.

What are your payment terms? What shipping methods do you accept?


The payment terms we usually accept include T/T with a 30% prepayment deposit, and the balance paid upon receipt of goods. Irrevocable letters of credit are also acceptable. We can provide shipping methods such as FOB and CIF, which can be arranged according to your specific requirements.